Zhengzhou Unique Industrial Equipment Co., Ltd

  • Increase font size
  • Default font size
  • Decrease font size
Home GLOBAL MARKET Asia The installation steps of concrete mixing station

The installation steps of concrete mixing station

E-mail Print PDF
The installation steps of concrete mixing station (1) finished product installation of belt conveyor Will be finished product belt conveyor, from bending after framework on the basis, framework, before and after the connection is good then before and after leg good connection with conveyer, brace and rack lug connection is good, then the front of conveyor lift, fitting of front and rear leg and brace, finally will leg before and after the anchor bolts. (2) mixing console and powder batching system installation Lift the main frame, on its basis, anchor bolt fastening them. (3) the installation of finished product storage hopper To finished product storage hopper hoist, the leg up, will walk, ladders and finished product storage hopper connection is good. (4) the aggregate batching system installation Lift aggregates batching system on the basis, connect the flashboard is good, good will pack up heightening plate connected to the board on both sides, then the original aggregate conveyer, connect the front and rear frame, make the electric drum mixer hood hole center, finally will anchor bolts.
Last Updated on Thursday, 11 May 2017 07:22  

product_list

Contact Us

Zhengzhou Unique Industrial Equipment Co., Ltd
ADD: Industrial Equipment Zone, Zhengshang Road, Zhengzhou, China
Zip Code: 450000
Tel: +86-371-65829915
Fax: +86-371-63935058
E-mail: sales@unique-cons.com

Quality Control


Contact info: Tel: +86-371-65829915 | Fax: +86-371-63935058 | E-mail: sales@unique-cons.com | tower crane china | tower crane |building hoist | trailer pump | stone crusher | sinoequips