Operation and instruction of concrete mixer pump

The concrete mixer pump is a piece of equipment that can mix and pump concrete mixture simultaneously when working. It is designed to simplify the concrete placement process 

by eliminating the need for separate equipment for mixing and pumping.

By integrating mixing and pumping ability, it offers a cost-effective and time-saving solution for concrete placement, making it an indispensable tool for modern construction projects, 

like residential, commercial, and infrastructure developments. Here I will explain to you how the concrete mixer pump works efficiently.

Operation and instruction of concrete mixer pump

I. Preparation

Check the equipment

Make sure that all parts of the mixing pump (such as mixing tank, conveying pipeline, hydraulic system, etc.) are in normal condition.

Check whether the oil level of the hydraulic tank is sufficient and whether the conveying hose is firmly connected.

Electrical system: verify that the control panel, cable and switch are not broken or leaking, and that the emergency stop button functions normally.

Trial run: start the equipment with no load, observe whether the operation is smooth and there is no abnormal noise or oil leakage.

Site selection

Choose a flat, solid ground to park the equipment, avoid tilting the equipment or sinking the legs due to soft ground.

Make sure the equipment is far away from high voltage lines and other obstacles to prevent safety accidents.

Pipeline laying: plan the route of conveying pipeline, reduce the use of 90° elbow, fixed bracket interval ≤ 3 meters, and additional reinforcement is required for the overhead section.

Safety distance: no obstacles within 3 meters around the equipment, set up warning fences and operation reminder signs.

Equipment cleaning

Before pumping concrete, pump it once with clean water to wet and clean the conveying pipe to avoid concrete clogging.

II, the operation steps

Starting the equipment

Before starting the pump equipment, make sure all operating handles are in neutral position.

Check whether there is any residual concrete in the mixing tank, if so, clean it up.

Make sure the voltage is stable (380V±5%) before turning on the main power.

Start the hydraulic system to warm up (extend to 15 minutes in winter)

Test the forward and reverse pump function with no load, the pressure gauge reading should be within the calibration range

After starting the equipment, wait for it to reach a stable state before starting to pump concrete.


Pumping concrete

Feeding order: first inject 1/3 water → stone → sand → cement → admixture → remaining water, be careful not to overdo it.

Mixing time: ≥90 seconds for concrete below C30, extended by 30% for high grade or special concrete

Slump control: pumping concrete should keep 160-220mm, retest every 2 hours in hot weather


Pumping operation

Initial pumping first push mortar lubrication pipe (0.5m³/100m)

Keep the concrete in the hopper submerged in the mixing shaft to avoid air intake.

Adopt “slow→fast→slow” variable speed pumping strategy, the maximum pumping pressure does not exceed 80% of the rated value.

Check the angle and position of the conveying hose at any time to avoid twisting or bending of the hose.


Equipment shutdown

Before stopping the machine, set the pumping speed to the lowest until the concrete is delivered.

Press the stop button to turn off the power of the equipment.

Clean residual concrete from mixing tank and delivery hose to avoid dry caking.

III. Key Precautions

3.1 Safety operation norms

Personal protection: wear helmet, non-slip boots, goggles, the operator shall not stand on the front of the conveying pipe.

Electrical safety: stop open-air operation in rainy days, cable should be overhead ≥ 50cm from the ground.

Emergency disposal: Immediately reverse the pump 3-4 times in case of pipe blockage, and stop the machine for dismantling when it is invalid.


3.2 Material control points

Maximum aggregate size ≤ conveying pipe diameter 1/3 (example: 125mm pipe diameter corresponds to ≤ 40mm stone)

Strictly prohibit the use of initial concrete, pumping temperature control in 5-35 ° C.

Randomly check the mud content (≤3%) and water content of sand and gravel every shift.


Thoroughly clean the mixing tank, conveying hose and pump body after each use to prevent concrete residue from clogging the equipment.

Regularly check the pump truck welds, boom pins and other parts to ensure that the equipment is in good condition.


Emergency Handling

If the remote control fails to work, press the “emergency stop” button immediately to prevent the equipment from going out of control.

In case of equipment failure or safety accident, stop operation immediately and contact professional maintenance personnel.

Contact Us

Concrete mixing pumpis a kind of construction equipment integrating mixing and pumping functions, which is widely used in construction sites. With the above steps and precautions, you can use the concrete mixer pump safely and efficiently to improve the construction efficiency and ensure the construction safety. For further information, please contact us.

Website: http://www.unique-cons.com

Whatsapp:+86 133 8403 5767

Email: sales@unique-cons.com

#concreteplant #mobileconcretebatchingplant #concretemixingplant

#UniqueGroup #batchingplant #concreteconstruction

Chat Online 编辑模式下无法使用
Leave Your Message inputting...